LIFE MetroForest › The project

LIFE MetroForest

LIFE METROFOREST is a European project co-funded by the European Commission’s LIFE programme (reference LIFE24-CCA-ES-LIFE-METROFOREST/101213657), coordinated by the Consorci del Parc Natural de la Serra de Collserola.

LIFE METROFOREST drives innovative tools and processes for adaptive agroforestry management and for the conservation and enhancement of biodiversity and the ecosystem services of Mediterranean metropolitan forests. The Serra de Collserola Natural Park will be the testing ground.

With a budget of €2,196,496 and the participation of six partner entities and one associated entity, LIFE METROFOREST develops replicable tools and instruments to manage Mediterranean metropolitan forests in a coordinated and sustainable way.

  • LIFE Climate Action
  • 2026–2030
  • 2.196.496 €
  • 6 partners
  • 9 work packages

Work structure

The nine work packages

The project is structured into nine work packages, from data-based diagnosis to replication of the model at the European scale.

WP1 Project management and coordination Lead: CPNSC

Responsible for the overall coordination of the project, administrative and financial management, and the formalization of agreements with the owners of the pilot estates. Ensures compliance with deadlines and the quality of deliverables to the European Commission.

WP2 Multi-Criteria Tool (EMC) Lead: AMB

Develops the MultiCriteria Tool (EMC), which integrates cartographic data, LiDAR, studies of natural systems, management actions and forest inventory to periodically and automatically generate forest condition indicators. The tool will streamline the management of activity authorizations and coordination among the consortium's services, authorities and bodies involved in managing the Park, and will support the monitoring of Park management and the future Massif Strategic Plan. The data generated by the LIFE project will be progressively incorporated into the EMC, which will be updated annually.

WP3 Management strategy at massif scale Lead: FORA

Focuses on territorial analysis and planning at the massif scale based on ecosystem services. The strategy seeks to integrate estate-level management proposals with a joint massif-scale management strategy for the entire Collserola Natural Park.

WP4 Analysis and diagnosis of the estates Lead: AMB

Identifies existing values in order to define agroforestry management needs and opportunities, ecological improvement, and climate change adaptation for each of the 6 pilot estates. The results feed into the design of the estate management plans (WP5), the pilot tests (WP6), and estate-level monitoring (WP7).

WP5 Design of the estate plan model Lead: CPNSC

Develops the methodology and model for the "estate management plan" to be applied individually to each estate. The model aims to be replicable in other estates within the Park and in other metropolitan natural areas.

WP6 Pilot trials of the estate plans Lead: CPNSC

Consists of the physical execution of the agroforestry and ecological improvement actions planned for the demonstration estates, following the management plans developed in WP5.

WP7 Evaluation and monitoring Lead: CREAF

Responsible for monitoring the impact of the actions on biodiversity and ecosystem services, both at the estate scale and at the Natural Park scale. Also generates the project's monitoring indicators.

WP8 Sustainability, replication and exploitation Lead: AMB

Works to ensure the sustainability of the project in the implementation territory, mobilizing public and private actors, and the extrapolation and transfer of its results and models to other local, regional or European natural areas.

WP9 Communication and dissemination Lead: AMB

Implements the project's communication strategy, which includes the creation and maintenance of the website, social media management, the publication of the Layman's report on the project's results, and the organization of the final conference.

Budget

Funding

2.196.496 €Total budget
1.317.898 €EU co-funding (60%)
878.598 €Partner contribution (40%)